Client Case Study – Luton Town Public Consultation Roadshow
Project Type: Roadshow
Brand: Luton Town Football Club
Client: Activation Agency
Objective
Luton Town FC wanted to present details of their proposed new stadium prior to full public consultation. It was decided that the best way to convey this message effectively was to create a fully immersive environment and utilise several popular venues within the town. This was to be done at three different venues over 8 days with no breaks.
The exhibition was to take visitors from a registration area through an ‘experience corridor’ showing the interwoven history of the club and town before arriving in a main breakout area. Two 3D scale models of the Power Court and Newlands Park sites were to be on display, along with graphics showing photos and general information. A side meeting area and an exit survey area were required.
Build and derig time had to be kept to an absolute minimum (Max 3 hours build and 2 derig)
Turnaround time from brief to first live activation: Less than 4 weeks